2024 01 v.46 52-57
Comparison on Offshore Wind Construction Vessel Workability Based on Two Inverted Distance Weighting Interpolating Schemes
Email:
DOI: 10.13788/j.cnki.cbgc.2024.01.08
English author unit:

CCCC Third Harbor Engineering Co., Ltd.;CCCC Research and Development Center on Offshore Power Construction Technology;School of Marine Engineering and Technology, Sun Yat-Sen University;

Abstract:

Two schemes of inverted distance weighting(IDW) method are proposed towards the interpolation of the construction vessel workability. In the comparison, the global forecast wave data, of which the spatial resolution is(1/12)° provided by France Meteo, is employed. The offshore wind mono pile foundation constructed by a crane vessel with 180 m length is studied, and 144 interpolating points averagely spaced in one of the planned China's wind farm is selected. The results show that, the construction vessel workability computed with two schemes is extremely similar to each other. The errors between both for any interpolating point is below 1.5%, which can be considered as equivalent in accuracy in engineering application perspective. It can be interchangeable in different application scenarios.

KeyWords: inverted distance weighting (IDW);workability;crane vessel;wave forecast data;offshore wind construction
References

[1]丁健,杜宇.外海开敞海域双峰谱混合浪对海上风电场施工作业的影响探讨[J].中国港湾建设, 2021, 41(8):20-23.DING J, DU Y. Discussion on the Influence of Bimodal Spectrum Mixed Wave on Offshore Wind Farm Construction in Open Seas[J]. China Harbour Engineering,2021, 41(8):20-23.(in Chinese)

[2]杜宇,王凯,高子予.开敞外海混合浪条件下打桩船施工窗口[J].船舶工程, 2022, 44(8):138-144.DU Y, WANG K, GAO Z Y. Pile Driving Vessel Weather Wind Under Mixed Wave Condition in Open Seas[J]. Ship Engineering, 2022, 44(8):138-144.(in Chinese)

[3]杜宇,高子予,王晨旭.基于时-频域联合计算的打桩船施工作业窗口计算[J].船舶工程, 2022, 44(3):139-144.DU Y, GAO Z Y, WANG C X. Calculation of the Construction Operation Window of the Pile Driving Vessel Based on the Time-Frequency Domain Joint Method[J].Ship Engineering, 2022, 44(3):139-144.(in Chinese)

[4]杜宇,王凯.减摇板改造的打桩船可作业窗口[J].船舶工程, 2022, 44(7):115-121.DU Y, WANG K. Weather Window for a Pile Driving Vessel Converted with Anti-Roll Plates[J]. Ship Engineering, 2022, 44(7):115-121.(in Chinese)

[5] SEKITA K, SHIMADA H, TANIYAMA M. The Operability of Derrick Barges in Construction of Large Offshore Structures[C]//The Offshore Technology Conference.1976.

[6] RAWSTRON P J M, BLIGHT G J. Prediction of Weather Downtime for Derrick Barges[C]//The Offshore Technology Conference.1978.

[7] NOJIRI N, SASAKI T. Motion Characteristics of Crane Vessels in Lifting Operation[C]//The Offshore Technology Conference. 1983.

[8] ZHENG X, MCGREGOR R C. Prediction of Motion,Wave Load, and Sling Tension of Crane Vessels During Heavy Lifting Operations[C]//The Offshore Technology Conference. 1988.

[9] CLAUSS G F, RIEKERT T. Operational Limitations of Offshore Crane Vessels[C]//The Offshore Technology Conference. 1990.

[10] ACERO W G, LI L, GAO Z, et al. Methodology for Assessment of the Operational Limits and Operability of Marine Operations[J]. Ocean Engineering, 2016, 125:308-327.

[11] ACERO W G, GAO Z, MOAN T. Numerical Study of a Novel Procedure for Installing the Tower and Rotor Nacelle Assembly of Offshore Wind Turbines Based on the Inverted Pendulum Principle[J]. Journal of Marine Science and Application, 2017, 16(3):243-360.

[12] ACERO W G, GAO Z, MOAN T. Assessment of the Dynamic Responses and Allowable Sea States for a Novel Offshore Wind Turbine Installation Concept Based on the Inverted Pendulum Principle[C]//13th Deep Sea Offshore Wind R&D Conference. 2016.

[13] ACERO W G, LI L. Methodology for Assessment of Operational Limits Including Uncertainties in Wave Spectral Energy Distribution for Safe Execution of Marine Operations[J]. Ocean Engineering, 2018, 165:184-193.

[14] LI L, ACERO W G, GAO Z, et al. Assessment of Allowable Sea States During Installation of Offshore Wind Turbine Monopiles with Shallow Penetration in the Seabed[J]. Journal of Offshore Mechanics and Arctic Engineering,2016, 138(4):041902.

[15] ACERO W G, GAO Z, MOAN T. Methodology for Assessment of the Allowable Sea States During Installation of an Offshore Wind Turbine Transition Piece Structure onto a Monopile Foundation[J]. Journal of Offshore Mechanics and Arctic Engineering, 2017, 139(6):061901.

[16] ACERO W G, MOAN T, GAO Z. Steady State Motion Analysis of an Offshore Wind Turbine Transition Piece During Installation Based on Outcrossing of the Motion Limit State[C]//34th International Conference on Offshore Mechanics and Arctic Engineering. 2015.

[17] LI C, GAO Z, MOAN T, et al. Numerical Simulation of Transition Piece-Monopile Impact During Offshore Wind Turbine Installation[C]//24th International Ocean and Polar Engineering Conference. 2014.

[18] GRACZYK M, SANDVIK P C. Study of Landing and Lift-off Operation for Wind Turbine Components on a Ship Deck[C]//31th International Conference on Oecan,Offshore and and Arctic Engineering. 2012.

[19]杜宇,高子予,王凯,等.起重船海上风机单桩基础“运装分离”施工窗口计算[J].船舶工程, 2023, 45(5):153-158.DU Y, GAO Z Y, WANG K, et al. Weather Window Computation for Offshore Wind Turbine Mono-Pile Foundation Installed by Crane Vessel with TransportingInstalling-Separated Method[J]. Ship Engineering, 2023,45(5):153-158.(in Chinese)

[20]严立文,黄海军,刘艳霞.基于GIS空间分析的海底表层沉积物粒度分布特征插值研究[J].海洋科学, 2010,34(1):58-64.YAN L W, HUANG H J, LIU Y X. GIS-Based Analysis of Spatial Interpolations of Sediments Grain Size in Heini Bay[J]. Marine Sciences, 2010, 34(1):58-64.(in Chinese)

[21]徐广珺,杨劲松,徐圆,等.“海洋二号”有效波高数据在多源卫星高度计数据融合中的应用[J].海洋学报,2013, 35(4):208-213.XU G J, YANG J S, XU Y, et al. The Data Fusion of the Significant Wave Height Measured with"HY-2"Satellite Altimeter[J]. Acta Oceanologica Sinica, 2013, 35(4):208-213.(in Chinese)

[22]蒋伟达,孙永福,刘绍文,等.基于IDW的埕岛海域水下三角洲地形演变[J].海洋科学进展, 2020, 38(4):697-707.JIANG W D, SUN Y F, LIU S W, et al. Terrain Evolution of Subaqueous Deltain Chengdao Sea Area Based on IDW[J]. Advances in Marine Science, 2020, 38(4):697-707.(in Chinese)

[23]中国造船工程学会,中国船舶工业集团公司,中国船舶重工集团公司.船舶设计实用手册总体分册[M]. 3版.北京:国防工业出版社, 2013.The Chinese Society of Naval Architects and Marine Engineers, China Shipbuilding Industry Corporation, China Shipbuiliding Industry Company Limited. Practical Handbook for Ship Design[M]. 3ed. Beijing:National Defense Industry Press, 2013.

[24] CHAKRABARTI S K. Hydrodynamics of Offshore Structures[M]. Southampton, UK:WIT Press, 1987.

[25]杜宇.海上固定式风力发电机组非嵌岩基础施工技术与装备[J].船舶工程, 2020, 42(12):14-19.DU Y. Construction Technology and Equipment for Non Rock-Socketed Foundations of Offshore Fixed Wind Turbines[J]. Ship Engineering, 2020, 42(12):14-19.(in Chinese)

[26]刘应中,盛振邦.船舶原理(下册)[M].上海:上海交大出版社, 2005.LIU Y Z, SHENG Z B. Principles of Ships(Volume 2)[M].Shanghai:Shanghai Jiaotong University Press, 2005.

Basic Information:

DOI:10.13788/j.cnki.cbgc.2024.01.08

China Classification Code:TM614;P75;U674.3

Citation Information:

[1]杜宇,王凯.基于两种反距离加权插值的海上风电施工船作业预报对比[J].船舶工程,2024,46(01):52-57.DOI:10.13788/j.cnki.cbgc.2024.01.08.

Fund Information:

中交第三航务工程局有限公司A类课题(2021-05); 广东省自然科学基金面上项目(2021A1515011771); 国家自然科学基金面上项目(52171289)